Inspector in Beaumont told me my firebox door alignment was off by 3/16 and made me redo the whole seal
Had a third party inspector walk my boiler job down in Beaumont back in March and he caught that my firebox door was sitting 3/16 out of square before I set the gasket. He said and I quote, "that gap will cook your seal in a month, ask me how I know," and made me pull the door and shim the hinge side before I could close it out. Cost me about 4 hours and a new gasket, but it also made me start checking door square with a feeler gauge before every seal instead of eyeballing it like I used to. I still keep his writeup taped inside my toolbox lid as a reminder. Curious if anyone else has had an inspector put a number to something you always just felt out by eye?