My tube prep went from 45 minutes to 12 after I stole one move from an old hand at the local 449 hall
I used to spend close to 45 minutes on tube prep for a boiler retube, and I figured that was just how long it took. Then last week I got paired with a guy who has been at it for decades, and he watched me for about ten minutes before he asked why I was rolling the tube ends by hand with a file before the bevel. He showed me how to set the beveler in the vise so I can feed the tube straight through and hit both ends in one pass, and the difference was not small. By Thursday I was getting a bundle prepped in 12 minutes flat, and the fit-up on the tube sheet was tighter than anything I had done before. I felt pretty dumb standing there, because I had been fighting the same lazy habit for almost 3 years and never once thought to ask. So what little shop habits did you pick up from an old hand that you wish someone had shown you on your first job?