D
21

Drove past a new build in Phoenix and the cable routing was a complete mess

Ngl, I was just passing through on a delivery route and saw this brand new house where the installer left about 10 feet of coax just dangling off the side. Everyone online seems to love these quick installs, but I think we gotta push back and take the extra 15 minutes to strap it clean. Anyone else seeing contractors rush jobs like this in your area?
2 comments

Log in to join the discussion

Log In
2 Comments
emeryfox
emeryfox1mo agoTop Commenter
Phoenix is 110 degrees and the installers are just trying to survive out there.
4
rodriguez.jordan
Frozen water bottles and a cooling towel was my go to. Made a huge difference when I was doing outdoor work in that kind of heat.
2