Pulled a power stretcher on a 12 year old berber instead of knee kicking it, and I'm glad I did
Last Thursday in a rental in Mesa I had a 14x18 room with old berber over concrete, and I almost just knee kicked it like always. Took the extra 20 minutes to set up the stretcher and it saved me from a seam split at the doorway that would've cost me the whole job. Anybody else swap methods on older goods or do you just wing it?