Just realized I scrapped 14 good parts because I trusted the tool offset over the chips
Was running a batch of aluminum brackets on the Haas last Tuesday night shift and the finish started looking off around part six, so I pulled the numbers instead of my head. Turned out the offset on tool 4 was sitting .012 deep from the last guy's setup and I'd been cutting past the print on every part. I stopped the run, re-probed the tool, and called the lead over to own it instead of sneaking the rest through. We saved the batch but I still ate 14 scrap parts and a earful about checking offsets before a run and not after. How do you all handle it when someone else's setup bites you halfway through a night shift?