Rant: my lead wants us to run 3 parts over on a bar feeder to save setup, I think it's nuts
So 2 months ago our lead in Fort Wayne started pushing us to run every job flagged as low volume at 3 parts over on the bar feeder instead of switching to the chucker, and we cut setup time by about 40 percent but our scrap on the finicky 17-4 parts doubled. Half the crew says the extra scrap is pocket change next to setup hours, and the other half says we are just hiding the real problem. Am I crazy for thinking extra parts should not be the default on tight tolerance stuff, or is that just how it goes now?
Did you ever try letting the finicky 17-4 stuff run on the chucker only and keeping 3 over for the easy jobs? I used to back the 3 over thing hard because setup hours are real money, but watching our scrap rate on tough parts made me switch sides. When you're eating a couple extra parts per run on tight stuff, that adds up fast and it's a lot harder to trace than a setup sheet. Setup time is easy to see on paper, scrap on a finicky run is not, and that's the part that bit me.