The 0.001 inch spec on our new aluminum job that scared me straight
Our print for the Detroit bracket job last month called for plus or minus 0.001 inch on a 6 inch bore, and I watched a seasoned operator scrap 4 parts before lunch because he trusted the readout over a warm-up cut. How do you all handle tight tolerance jobs when the shop floor swings 15 degrees between morning and afternoon?