I finally stopped overworking my edges after a guy in Tulsa called me out on a slab
I was finishing a 30x40 shop floor in Tulsa last spring and ran my edger way too wet, thinking I was being careful. The older finisher on the job walked over, pointed at the crust pulling up along my form line, and said I was working it before it was ready. Sure enough, three spots tore out and I spent an extra hour patching what should have been a clean pass. Turns out I had the timing backward the whole time, I was scared of it setting up on me so I went early every time. How do you all judge when a slab is ready for the edger, do you go by feel with the trowel or watch the bleed water?