My 4 inch slab cracked on the driveway apron, here's what I messed up
Honestly I poured a 12 by 14 apron out in front of a garage in Mesa last Tuesday and it looked dead on until I pulled the forms two days later. Found a hairline running about 3 feet across the corner, right where the mix got away from me while I was floating the other end. I think I let the edge dry out too fast in that 100 degree heat, I never got the cure blanket on till almost dark. Tbh the control joints were spaced about 10 feet apart and I'm second guessing if that was too wide for the pour. I ended up routing it out and filling with a semi rigid epoxy, looks decent but I know it's still there underneath. Has anyone here had luck with a shorter joint spacing on full sun aprons, or do you just soak the forms down first?