Pro tip: found out I was floating my slabs way too early, the edger was telling me the whole time
Was working a 30x40 pad in Reno and kept fighting a crust that tore every time I got on it with the edger. Finally watched this old finisher wait a good 20 minutes longer than me on the same mix, and his edge came out glassy while mine looked chewed up. How long do you all wait before edging on a hot day?