Warning: the GC at my Des Moines job told me to skip the vapor barrier, and I did
Three days later the inspector flagged the whole wall and I had to pull 40 feet of drywall back off at my own cost, so now I'm stuck between eating $1,800 or billing the GC and losing the contract. Do you push back on a bad call in writing or just do it and document the fallout?