Pro tip: our laydown yard at the Taylor site went from 40 bundles stacked chest high to a clear 60 foot lane in 2 days, all because the super finally moved the portajohn | Crane Operators - Discusd
Pro tip: our laydown yard at the Taylor site went from 40 bundles stacked chest high to a clear 60 foot lane in 2 days, all because the super finally moved the portajohn
Funny how that works. We had the same thing on a job where the john sat right where the crane needed to swing, and nobody touched the pile for a week. Soon as it moved, guys suddenly found a use for every scrap of that space (funny how fast a crew gets motivated when they can walk a straight line to the tools). Best advice: get the can and the dumpster placed before the material shows up, not after. Takes ten minutes with the super and saves you a week of watching guys climb over bundles.