When we started our build in Franklin last spring, the first framing crew used a nail gun and I could see light under a 4 foot level along the top plate. Builder swapped crews after a delay, and the new guys screwed the studs, and by the third week of framing the walls were flat enough that the drywall hanger asked if we'd used steel studs. Part of me thinks screws are slower and add cost, part of me thinks nails let the wood move too much during the dry months here. My builder said the screw crew adds about $1,800 to the frame, which sounds cheap next to fixing bowed walls after the fact. Am I wrong to push for screws on the whole house, or is this a fight not worth having?